A dominance-based rough set approach applied to evaluate the credit risk of sovereign bonds |
A gap in scientific reporting |
A note on the integrality gap of cutting and skiving stock instances |
A note on the integrality gap of cutting and skiving stock instances |
An alternate approach to solve two-level hierarchical time minimization transportation problem |
Challenges and opportunities in crowdsourced delivery planning and operations |
Correction to: Exact distributional analysis of online algorithms with lookahead |
Preference elicitation for a ranking method based on multiple reference profiles |
A detailed note on the finite-buffer queueing system with correlated batch-arrivals and batch-size-/phase-dependent bulk-service |
A multiple criteria socio-technical approach for the Portuguese Army Special Forces recruitment |
Approximation issues of fractional knapsack with penalties: a note |
Matheuristics: using mathematics for heuristic design |
On the stochastic vehicle routing problem with time windows, correlated travel times, and time dependency |
Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost |
Teaching OR: automatic evaluation for linear programming modelling |
Home health care routing and scheduling problems: a literature review |
Measures of balance in combinatorial optimization |
Multi-period distribution network problems with minimum commitment contracts |
A note on ELECTRE TRI-nB with few limiting profiles |
Optimality conditions and Mond–Weir duality for a class of differentiable semi-infinite multiobjective programming problems with vanishing constraints |
Partition-based distributionally robust optimization via optimal transport with order cone constraints |
Simple ranking method using reference profiles: incremental elicitation of the preference parameters |
Cross Malmquist Productivity Index in Data Envelopment Analysis |
The grid based approach, a fast local evaluation technique for line planning |
An iterative solution technique for capacitated two-stage time minimization transportation problem |
Moderate exponential-time algorithms for scheduling problems |
A note on the complexity of the bilevel bottleneck assignment problem |
A study on sequential minimal optimization methods for standard quadratic problems |