"
Hierarchical optimization with double due dates on an unbounded parallel-batching machine to minimize maximum lateness |
Improved algorithms for single machine scheduling with release dates and rejections |
Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost |